城市轨道交通信号工程施工质量验收规范 GB50578-2010

副标题:无

作   者:中华人民共和国住房和城乡建设部 组织编译

分类号:

ISBN:9787112169863

微信扫一扫,移动浏览光盘

简介

1 General Provisions2 Terms3 Basic Requirement 3.1 General Requirements 3.2 Classification of Quality Acceptance of Signaling Engineering Works 3.3 Quality Acceptance of Signaling Engineering Works4 Electrical (Optical) Cable Lines 4.1 General Requirements 4.2 Cable Bracket and Cable Tray Installation 4.3 Electrical (Optical) Cable Laying 4.4 Electrical (Optical) Cable Protection 4.5 Electrical (Optical) Cable Splicing 4.6 Installation of Case and Box5 Fixed Signal, Train Departure Indicator and Button Device 5.1 General Requirements 5.2 High Signal Installation 5.3 Dwarf Signal Installation 5.4 Non-standard Signal Installation 5.5 Train Departure Indicator Installation 5.6 Button Device Installation6 Switching Equipment 6.1 General Requirements 6.2 Installation of Installation Devices 6.3 External Locking Device Installation 6.4 Switch Machine Installation7 Train Detection and Train Wayside Communication  7.1 General Requirement 7.2 Installation of Rail Insulated Joint Track Circuit 7.3 Installation of Jointless Track Circuit 7.4 Impedance Connector Installation 7.5 Loop Installation 7.6 Waveguide Installation 7.7 Leaky Coaxial Cable Installation 7.8 Balise Installation 7.9 Positioning Antenna Installation 7.10 Terminal Receiver Installation 7.11 Radio Access Unit Installation 7.12 Axle Counter Installation8 Onboard Equipment 8.1 General Requirements 8.2 Cabinet, Equipment and Man machine Interface Installation 8.3 Installation of Antenna and Speed Measurement Device 8.4 Wiring9 Indoor Equipment 9.1 General Requirements 9.2 Cabinet (Rack) Installation 9.3 Cabling Rack (Tray) Installation 9.4 Electrical (Optical) Cable Lead-in and Installation 9.5 Operation and Display Equipment Installation 9.6 Large Screen Display Equipment Installation 9.7 Power Supply Equipment Installation 9.8 Wiring10 Lightning Protection and Earthing 10.1 General Requirements 10.2 Lightning Protection Device Installation 10.3 Earthing Device Installation11 Equipment for Testing Track 11.1 General Requirements 11.2 Installation 11.3 System Function Test12 Marking and Reinforcement of Outdoor Signaling Equipment 12.1 General Requirements  12.2 Equipment Marking 12.3 Reinforcement13 Interlocking 13.1 General Requirements 13.2 Indoor Single Item Test 13.3 Outdoor Single Item Test  13.4 Integrated Test14 Computer Monitoring 14.1 General Requirements 14.2 Function and Performance Test of Computer Monitoring Equipment 15 Automatic Train Protection  15.1 General Requirements 15.2 ATP System Function Inspection16 Automatic Train Supervision 16.1 General Requirements 16.2 ATS System Function Inspection17 Automatic Train Operation  17.1 General Requirements 17.2 ATO System Function Inspection18 Automatic Train Control 18.1 General Requirements 18.2 ATC System Function Inspection19 Quality of Appearance of Unit Works 19.1 General Requirements 19.2 Electrical (Optical) Cable Line 19.3 Outdoor Equipment 19.4 Onboard Equipment 19.5 Indoor EquipmentAppendix A Inspection Records of Quality Management of Construction SiteAppendix B Quality Acceptance Records of Inspection LotAppendix C Quality Acceptance Records of Subdivisional WorksAppendix D Quality Acceptance Records of Divisional WorksAppendix E Completion Quality Acceptance Records of Unit WorksExplanationsof Wording in This CodeList of Quoted Standards

目录

1 General Provisions
2 Terms
3 Basic Requirement
 3.1 General Requirements
 3.2 Classification of Quality Acceptance of Signaling Engineering Works
 3.3 Quality Acceptance of Signaling Engineering Works
4 Electrical (Optical) Cable Lines
 4.1 General Requirements
 4.2 Cable Bracket and Cable Tray Installation
 4.3 Electrical (Optical) Cable Laying
 4.4 Electrical (Optical) Cable Protection
 4.5 Electrical (Optical) Cable Splicing
 4.6 Installation of Case and Box
5 Fixed Signal, Train Departure Indicator and Button Device
 5.1 General Requirements
 5.2 High Signal Installation
 5.3 Dwarf Signal Installation
 5.4 Non-standard Signal Installation
 5.5 Train Departure Indicator Installation
 5.6 Button Device Installation
6 Switching Equipment
 6.1 General Requirements
 6.2 Installation of Installation Devices
 6.3 External Locking Device Installation
 6.4 Switch Machine Installation
7 Train Detection and Train Wayside Communication 
 7.1 General Requirement
 7.2 Installation of Rail Insulated Joint Track Circuit
 7.3 Installation of Jointless Track Circuit
 7.4 Impedance Connector Installation
 7.5 Loop Installation
 7.6 Waveguide Installation
 7.7 Leaky Coaxial Cable Installation
 7.8 Balise Installation
 7.9 Positioning Antenna Installation
 7.10 Terminal Receiver Installation
 7.11 Radio Access Unit Installation
 7.12 Axle Counter Installation
8 Onboard Equipment
 8.1 General Requirements
 8.2 Cabinet, Equipment and Man machine Interface Installation
 8.3 Installation of Antenna and Speed Measurement Device
 8.4 Wiring
9 Indoor Equipment
 9.1 General Requirements
 9.2 Cabinet (Rack) Installation
 9.3 Cabling Rack (Tray) Installation
 9.4 Electrical (Optical) Cable Lead-in and Installation
 9.5 Operation and Display Equipment Installation
 9.6 Large Screen Display Equipment Installation
 9.7 Power Supply Equipment Installation
 9.8 Wiring
10 Lightning Protection and Earthing
 10.1 General Requirements
 10.2 Lightning Protection Device Installation
 10.3 Earthing Device Installation
11 Equipment for Testing Track
 11.1 General Requirements
 11.2 Installation
 11.3 System Function Test
12 Marking and Reinforcement of Outdoor Signaling Equipment
 12.1 General Requirements 
 12.2 Equipment Marking
 12.3 Reinforcement
13 Interlocking
 13.1 General Requirements
 13.2 Indoor Single Item Test
 13.3 Outdoor Single Item Test 
 13.4 Integrated Test
14 Computer Monitoring
 14.1 General Requirements
 14.2 Function and Performance Test of Computer Monitoring Equipment 
15 Automatic Train Protection 
 15.1 General Requirements
 15.2 ATP System Function Inspection
16 Automatic Train Supervision
 16.1 General Requirements
 16.2 ATS System Function Inspection
17 Automatic Train Operation 
 17.1 General Requirements
 17.2 ATO System Function Inspection
18 Automatic Train Control
 18.1 General Requirements
 18.2 ATC System Function Inspection
19 Quality of Appearance of Unit Works
 19.1 General Requirements
 19.2 Electrical (Optical) Cable Line
 19.3 Outdoor Equipment
 19.4 Onboard Equipment
 19.5 Indoor Equipment
Appendix A Inspection Records of Quality Management of Construction Site
Appendix B Quality Acceptance Records of Inspection Lot
Appendix C Quality Acceptance Records of Subdivisional Works
Appendix D Quality Acceptance Records of Divisional Works
Appendix E Completion Quality Acceptance Records of Unit Works
Explanationsof Wording in This Code
List of Quoted Standards

已确认勘误

次印刷

页码 勘误内容 提交人 修订印次

城市轨道交通信号工程施工质量验收规范 GB50578-2010
    • 名称
    • 类型
    • 大小

    光盘服务联系方式: 020-38250260    客服QQ:4006604884

    意见反馈

    14:15

    关闭

    云图客服:

    尊敬的用户,您好!您有任何提议或者建议都可以在此提出来,我们会谦虚地接受任何意见。

    或者您是想咨询:

    用户发送的提问,这种方式就需要有位在线客服来回答用户的问题,这种 就属于对话式的,问题是这种提问是否需要用户登录才能提问

    Video Player
    ×
    Audio Player
    ×
    pdf Player
    ×
    Current View

    看过该图书的还喜欢

    some pictures

    解忧杂货店

    东野圭吾 (作者), 李盈春 (译者)

    loading icon